Hello everyone,
It's great to have options for every single existing language in the subtitle Download options to integrate with the Plug-ins, however, in the TV/Web Client, it's annoying to have to scroll down several pages between 2 preferred languages (i.e. English and Portuguese for example have 89 entries in between).
Despite of the time required to scroll between selections, it also consumes a lot of remote control batteries
Would be possible to edit the combo list to show